Who doesn’t love a great case study? I know I do, which is why I wanted to share with you the successes of Combustion Boiler Burners.
John Zink Company develops technologically superior equipment and systems for the clean and efficient combustion of fossil fuels and the removal of contaminants that might otherwise enter the atmosphere.
In this case study, Daniel Gonzalez, a designer at John Zink Company, shares his experience with the productivity gains using DriveWorksXpress. DriveWorksXpress drastically reduced design time for John Zink Company. What typically took 1 – 2 days now only takes 2 minutes with the help of DriveWorks!
Check out the entire case study here.